NNM07AB03C: THE BOEING COMPANY
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
Recipient
THE BOEING COMPANY →Status
FY2026 transaction; performance ended in 2025 or later
PIID
NNM07AB03C
Awarding agency
National Aeronautics and Space Administration
Dates
September 1, 2007 – December 31, 2028
Obligated amount
$10.5B
Outlayed amount
$4.5B
Current award amount
$10.5B
Potential award amount
Not available
This contract appears because USAspending reports an award transaction in FY2026 and its reported performance end date is in 2025 or later, or no end date is reported. A transaction can be a modification or administrative action; it does not by itself mean work was actively performed that year. The obligation shown is the cumulative prime-award obligation, not necessarily the amount newly obligated during FY2026. Federal data last updated September 17, 2026.
View original USAspending source ↗For researchers
Cite this page
The Paper Trail Project. “NNM07AB03C: THE BOEING COMPANY.” Accessed September 23, 2026. https://www.papertrailproject.org/awards/nnm07ab03c-311426504
Record last updated 2026-09-17. Sources: USAspending.gov. Verify consequential claims against the linked original records.